Shashikant Sarada

Greater Houston Contact Info
3K followers 500+ connections

Join to view profile

About

Shashikant has over 20 years of experience as a hands-on engineer and project manager on…

Articles by Shashikant

See all articles

Activity

Join now to see all activity

Experience & Education

  • WSP USA

View Shashikant’s full experience

See their title, tenure and more.

or

By clicking Continue to join or sign in, you agree to LinkedIn’s User Agreement, Privacy Policy, and Cookie Policy.

Licenses & Certifications

Publications

Projects

  • Empire Wind

    Empire Wind is planned for an area of 80,000 acres, in federal waters, an average of 20 miles south of Long Island, east of the Rockaways.

    See project
  • Sunrise Wind HVDC Platform

    - Present

    An approximately 924 MW offshore wind farm.
    50/50 partnership between Ørsted and Eversource.

    See project
  • Coastal Virginia Offshore Wind

    - Present

  • Peregrino Phase 2

    -

    Peregrino is presently developed with two wellhead platforms and a floating production, storage and offloading unit (FPSO). A system of pipelines, risers, and cables connects this FPSO and the two wellhead platforms.

    The Peregrino Phase II field development will add a third wellhead platform, as this area is not accessible by the existing two platforms. It contains an eight-legged jacket and a wellhead platform with a drilling unit (WHP-C) tied-back to the existing FPSO.

    See project
  • Blue Marlin Offshore Port - MARAD Application

    -

    Blue Marlin Offshore Port, also known as BMOP, is a proposed deep water crude oil export terminal off the coast of Texas, United States.

    See project
  • Appomattox Capping Stack project in the Gulf of Mexico

    -

    Appomattox is located about 80 mi (128 km) offshore Louisiana in about 7,200 ft (2,194 m) of water. Shell is currently the only operator with commercial discoveries in this formation, the Norphlet play, which dates back to the Jurassic period. The development will initially produce from both the Appomattox and Vicksburg fields, with average peak production estimated to reach about 175,000 boe/d, Shell said.

    See project
  • Rampian Offshore Wind

    -

    Factory acceptance testing for CAF system for offshore substation for Rampian offshore Wind farm located 14 km from the Sussex coast.

  • Jangkrik FPU

    -

    Jangkrik FPU will have a treating capacity of 450MMSCFD of gas plus condensates and once completed, the Jangkrik field is expected to provide feedstock to Indonesia’s Bontang LNG plant.

    See project
  • Hebron Drilling and Production Project

    -

    The Hebron GBS will be located offshore Newfoundland and Labrador in the Jeanne d'Arc Basin 350 kilometers southeast of St. John's. It consists of an integrated topsides deck that includes living quarters and facilities to perform its offshore drilling & production operations. Below the topsides, the GBS will consist of reinforced concrete that is designed to withstand sea ice, icebergs, and harsh ocean conditions.The field was first discovered in 1980, and is estimated to produce more than 700…

    The Hebron GBS will be located offshore Newfoundland and Labrador in the Jeanne d'Arc Basin 350 kilometers southeast of St. John's. It consists of an integrated topsides deck that includes living quarters and facilities to perform its offshore drilling & production operations. Below the topsides, the GBS will consist of reinforced concrete that is designed to withstand sea ice, icebergs, and harsh ocean conditions.The field was first discovered in 1980, and is estimated to produce more than 700 million barrels of recoverable resources.

    See project
  • Cape Wind Project

    -

    The Cape Wind Project is an approved offshore wind farm on Horseshoe Shoal in Nantucket Sound off Cape Cod, Massachusetts, United States. The wind farm, which may become the first offshore wind energy project in United States coastal waters, is projected to generate 1,500 gigawatt hours of electricity per year derived from wind power.
    https://gcaptain.com/appointed-boemres-eyes-ears/

    See project
  • BW Pioneer FPSO for Cascade and Chinook field Development

    -

    The FPSO BW Pioneer is moored in 2,600 m of water in US Gulf of Mexico to a disconnectable turret mooring system that will allow it to disconnect in case of severe weather and later reconnect and continue operations.

    See project

Recommendations received

More activity by Shashikant

View Shashikant’s full profile

  • See who you know in common
  • Get introduced
  • Contact Shashikant directly
Join to view full profile

Other similar profiles

Explore collaborative articles

We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.

Explore More

Add new skills with these courses